日本αV,男人天堂手机在线2024,日本强伦人妻bd中文,天天躁日日躁狠狠的躁天龙影院

PU Sandwich Panel Line - PIR Sandwich Panel Production Machine - Sinowa

Six conditions that need to be met in the construction of pu sandwich panel production line

Author: Sinowa/Post Date: 2021-08-02/Keywords: pu sandwich panel production line

Sinowa is familiar with the trends of the thermal insulation industry at home and abroad, and always brings effective first information to the readers. Today, I will bring you six conditions that need to be met for the construction of the polyurethane sandwich panel production line:

First of all, the polyurethane sandwich panel base wall should meet the requirements of the specification, and it has been checked and accepted.

pu sandwich panel production line

The construction of the polyurethane sandwich panel project should be carried out after the base layer is painted with a cement mortar leveling layer and the construction quality is qualified.

Before the construction of the thermal insulation project, the outer door and window openings should pass the acceptance, the size and location of the openings should meet the design requirements and the acceptance should be qualified. The door and window frames or auxiliary frames should be installed and waterproofed. The embedded parts and connectors of fire ladders, downpipes, various entrance pipelines and air conditioners that extend out of the wall should be installed, and the thickness of the polyurethane sandwich panel should be reserved.

pu sandwich panel production line

External wall scaffolding for the installation of insulation boards is required, and the scaffolding should be stable and reliable.

The ambient temperature during construction should not be higher than 35℃, should not be lower than 5℃, and should not be lower than 0℃ within 24h, and the wind should not be higher than level 5. Rainproof measures should be taken during construction in rainy days.

pu sandwich panel production line

The incoming materials of polyurethane sandwich panels should be stored in a dry and cool place, and the storage period and conditions should be in accordance with the requirements of the material supplier’s product description.

The above is the construction requirements for polyurethane sandwich panels brought to you today. Sinowa is engaged in pu sandwich panel line equipment and has unique insights on the process of color steel insulation panels. More customers are welcome to come to consult.

Page Url: http://hfljw.cn/en/six-conditions-that-need-to-be-met-in-the-construction-of-pu-sandwich-panel-production-line.html

You are here: Home / News / Six conditions that need to be met in the construction of pu sandwich panel production line
Contact Us
Email: sinowa@sinowa.cn
Call: +0086 151 0610 6366
Add: High-tech Industrial Development Zone, Zhenjiang, China
天堂在/线资源中文在线| 老头日b视频| 人人人人人妻人人人人人人草| 日韩AV高清在线看片| 99热只有精品在线观看 | 久操这里只有精品| 国产性天天综合网| 国产精品一区二区,动漫| 亚洲高清无码一区二区三区免费视频| 不卡视频综合在线| 好男人www在线影院官网| 国产真实伦在线观看视频| 国内精品色视频| 好吊妞人人超碰| A级毛片在线免费观看黄皮 | 乱人伦中文字幕成人网站在线| 精品亚洲中文字幕免费播放| 久久久老熟女一区二区三区| 永久免费AV| www.欧美性爱.cnm| 99re14| 国产精品久久久久久久久久妞妞| 国产精品久久久久久吹潮| 精品久久久久久综合日本精品国产麻| 欧美日韩人妻色欲一区二区三区| 久久国产精品系列| a女久久99| setingtingav| 玩成熟老熟女视频二区| 国产尤物在线| 婷婷激情丁香五月| 69精品人伦一区二区三区 | 欧美成人天天综合在线| 性BBwBBwBBw| 亚洲激情人妻区| 欧洲美女色女网| 中文字幕在线免费看线人| 久久AV免费| 男人av天堂资源网| 最近高清中文字幕免费MV| 少妇暴爽狂叫|